Site Visit and Technical Due Diligence
  • Río Project, 3rd Auction (350 MW; 2017). México.
  • Nueva Xcala Project, 3rd Auction (200 MW; 2017). México.
  • Fresnillo Project, 3rd Auction (150 MW; 2017). México.
  • Conejos Medanos Project. 3rd Auction (100 MW; 2017). México.
  • Horus Project, 3rd Auction (95 MW; 2017). México.
  • Los Alpes Project, 3rd Auction (70 MW; 2017). México.