PR Test, Monitoring and Calculation

PR Test, Monitoring and Calculation

Viborillas 129 MW. Estado de México-Mexico. (2018) Monitoring. Tuli 187 MW. Zacatecas-Mexico. (2019) Calculation and Analysis. Helios 187 MW. Zacatecas-Mexico. (2019) Calculation and Analysis. La Pimienta 442 MW. Campeche-Mexico. (2019) Calculation and Analysis. Viborillas 129 MW. Estado de México-Mexico. (2019) PR Test. Tuli 187 MW. Zacatecas-Mexico. (2020) PR Test. Helios 187 MW. Zacatecas-Mexico. (2020) PR

Read more

Performance Diagnosis and modelling

Performance Diagnosis and modelling

Tuli Solar Plant 187 MW. Zacatecas-Mexico. (2019) Modeling. Helios Solar Plant 187 MW. Zacatecas-Mexico. (2019) Modeling. Mezquite Wind Farm 250 MW. Mezquite-Mexico (2020) Modeling. Orejana 162 MW. Hermosillo-Mexico (2020) Performance Diagnosis. Santa María 181 MW. Hermosillo-Mexico (2020) Performance Diagnosis.

Read more

Site Visit and Technical Due Diligence

Site Visit and Technical Due Diligence

Río Project, 3rd Auction (350 MW; 2017). México. Nueva Xcala Project, 3rd Auction (200 MW; 2017). México. Fresnillo Project, 3rd Auction (150 MW; 2017). México. Conejos Medanos Project. 3rd Auction (100 MW; 2017). México. Horus Project, 3rd Auction (95 MW; 2017). México. Los Alpes Project, 3rd Auction (70 MW; 2017). México.

Read more